Please join us for expert discussions over the course of the convention.
ASBI 27th Annual Convention. November 3-5, 2015
Omni Dallas Hotel. Dallas, TX
Jerry M. Pfuntner, P.E., S.E. presenting:
- What is Right Approach for Long Term Creep & Shrinkage Effects – CEB fip 78 vs. 90 Design Codes. November 3rd Design Session 8:50AM-9:10AM.
- The Use of Precast Anchor Blocks on Ironton-Russell Bridge Replacement. November 3rd Design Session 9:30AM-9:50AM.
Jindrich Potucek, P.E. presenting:
- Bridge 303 over Road 6, Israel – Precast Box Designed for Future Widening and Two Additional Lanes of Traffic. November 3rd International Session 9:30AM-9:50AM.
The Year in Infrastructure. November 3-5, 2015
Hilton, London Metropole. United Kingdom
As one of the 2015 Be Inspired Awards Finalists, Craig Finley, Jr., P.E. presenting two projects:
US 281 Bridge over Colorado River in Marble Falls, TX and the I-49 North (I-220 to Martin Luther King Drive) Segment K project in Caddo Parish, LA. November 3rd. Session 3 Innovation in Bridges 4:30-6:00 PM