This project consists of two new precast segmental bridges, which will provide a fast connection to the new extension of the Port of Haifa, Israel. The bridges span over Road 22, a major arterial in North of Haifa which was …
The new elevated Taxiway A and Bridge at the Tampa International Airport includes the realignment of an existing roadway that crosses under the new Taxiway A Bridge and the existing parallel Taxiway B Bridge. This Taxiway consists of two variable …
The new U.S. 98 Pensacola Bay Bridge will carry six lanes of traffic and two pedestrian shared use paths on twin 16,138-ft-long bridges (105 spans) with simply supported span lengths of approximately 105 ft and a three span continuous 795-ft-long …
This $235M design-build project includes three, new cast-in-place segmental bridges with span lengths of (260’, 360’, 260’) built in balanced cantilever. This highly aesthetic bridge is designed to blend into the natural surroundings. To minimize impacts to the river and …
The Estero Flyover is 561 ft. long with spans of 340 ft. and 221 ft., and approximately 116 ft. wide. It extends Estero Parkway over I-75, connecting to Ben Hill Griffin Parkway at a total bid cost of $35 million. …
This $177M project includes improvements for the SR 91 / SR 417 interchange to accommodate widening of SR91 Florida’s Turnpike. As the sub-consultant to Pevida Highway Designers (prime) and The Lane Construction Corporation (contractor), FINLEY Engineering Group (FINLEY) prepared the …
The $40 million Road 70 Bridge 303 spans Road 6 and is part of a larger P3 project. This project phase consists of a two lane (12.4 m-wide), precast concrete segmental superstructure, 361 m-long with 7 spans and a maximum …
Project completed by staff prior to FINLEY The Sutong Bridge is a longest main span (1,088m) cable-stayed bridge in the world. It spans the Yangtze River in the People’s Republic of China. The two side spans are 300m each, and …
Project completed by staff prior to FINLEY The $1.3 billion Confederation Bridge is a curved, 12.9 kilometer (8 mile) long bridge, the longest in the world crossing ice-covered water. It is one of Canada’s top engineering achievements of the 20th …
Project completed by staff prior to FINLEY This concrete cable-stayed bridge (724m long, Main span: 320m) was completed in 1977. The bridge utilizes approaches built using the balanced cantilever erection method and form travelers on both sides. Construction of the …