Road 722 Design-Build. Haifa, Israel

This $68 million project is a twin precast concrete segmental bridge and has a total length of 314 meters. The five spans for the bridge range in length from 38.5 to 60.0 meters at a maximum distance above ground of 6.5 …

1 2