Project completed by staff prior to FINLEY
This concrete cable-stayed bridge (724m long, Main span: 320m) was completed in 1977. The bridge utilizes approaches built using the balanced cantilever erection method and form travelers on both sides. Construction of the bridge includes steel cables, a precast prestressed concrete deck and reinforced concrete piers and precast webs. Total length: 1,278m.