During the construction of the Lee Roy Selmon Expressway a combination of unstable soil and excessive weight from the 175 ton steel truss caused a pier to sink 20 ft., collapsing a section of the elevated precast segmental viaduct. FINLEY provided cost estimation and construction engineering review for the repair of this structure.