SR 836/I-395 from west of I-95 to the MacArthur Causeway Bridge Design-Build-Finance (P3). Miami, Florida


Services Provided by FINLEY

  • Pre-bid Bridge Design

Owner

Florida Department of Transportation

Client

FCC/Condotte

Start Date

January 2015

Completion Date

Present

Cost

$617M

This project consists of the reconstruction of approximately 1.4 miles of I-395 to improve connectivity between I-95, Port Miami and surrounding communities. This project includes the design of a signature bridge located over Biscayne Boulevard, in the heart of Miami.

FINLEY provided prebid design for the I-395 Mainline and Ramps. The bridge design includes a precast concrete segmental bridge with a minimum span length of 250’.

Review Project

Note: Your email address will not be published. Required fields are marked *